Supervision will manage the implementation and the configuration of the different types of project documents, not including ()
A.compile B.format C.version D.change
单项选择题In software engineering and systems engineering, ()is a description of a systems behavior as it responds to a request that originates from outside of that system.
A.black box B.busines srule C.traceability matrix D.use case
单项选择题实行总分包的工程,分包应按照分包合同约定对其分包工程的质量向总包单位负责,总包单位与分包单位对分包工程的质量承担()。
A.连带责任 B.违约责任 C.违法责任 D.赔偿责任